Skip to content

M2 High-Speed Steel CNC Machining

M2 High-Speed Steel (UNS T11302) is a very difficult-to-machine material that we run regularly for export customers. It has a density of 8.16 g/cm3, a tensile strength of 2400 MPa and a typical hardness of HRC 64. Those numbers make it the right choice for drills and taps and broaches, and a poor choice when cost or corrosion resistance matters more than mechanical performance.

On our machines we hold +/-0.03 mm on turned and milled features and reach Ra 1.6 um where the drawing calls for it. Standard lead time for M2 High-Speed Steel parts is 5-10 working days, including material procurement, machining and any finishing operation you specify.

M2 High-Speed Steel: key properties

Property Value
UNS / designation T11302
Density 8.16 g/cm3
Tensile strength 2400 MPa
Hardness HRC 64
Machinability Very difficult
Suggested cutting speed (carbide) 60-90 m/min
Relative material cost 4 of 5

Machining M2 High-Speed Steel: what to plan for

  • Extremely abrasive
  • Only machinable annealed
  • High red hardness needs CBN grinding

Cutting speed for M2 High-Speed Steel with carbide tooling sits around 60-90 m/min. Going faster burns the edge; going much slower causes rubbing and a poor surface. Flood coolant is not optional here. If your part has thin walls or a lot of stock to remove, say so in the RFQ — we plan roughing, stress relief and finishing as separate operations when the geometry demands it.

Parts we machine in M2 High-Speed Steel

  • Drills and taps
  • Broaches
  • Cutting tools
  • Punches

Most M2 High-Speed Steel work arrives as 2D drawings with a mix of critical and non-critical features. Loosening tolerance on the non-critical ones is the fastest way to cut cost, and we will tell you which features those are before we quote.

Tolerances, finish and lead time

Item Capability
General tolerance +/-0.03 mm
Achievable surface finish Ra 1.6 um
Minimum wall thickness 0.8 mm (aluminium) / 1.0 mm (steel and stainless)
Typical lead time 5-10 working days
Prototype quantity 1 piece
Production quantity 10 to 50,000 pieces

Frequently asked questions

What is the lead time for M2 High-Speed Steel parts?

Standard is 5-10 working days from drawing release, assuming the material is in stock. Exotic grades and cast forms can add 5 to 10 days. Finishing such as anodizing or plating adds 3 to 5 days.

What tolerance can you hold in M2 High-Speed Steel?

+/-0.03 mm is routine on turned and milled features. Tighter than that is possible on specific features by grinding or lapping, but it is quoted separately because it changes the process.

Do you keep M2 High-Speed Steel in stock?

We hold common sizes of M2 High-Speed Steel and buy mill-certified stock for everything else. Material certificates are supplied with the parts on request.

Can you supply M2 High-Speed Steel parts with a certificate of conformity?

Yes. We issue a dimensional report, a material certificate and a certificate of conformity as standard for production orders, and full PPAP or AS9102 paperwork when the programme requires it.

Related pages

Get a price for your part

Send a STEP file and a drawing with tolerances, material and quantity. We quote within one working day and machine in our own facility in Shenzhen — milling, turning, EDM, grinding and finishing under one roof, no trading middleman.

Start an instant quote or send your drawings directly. English-speaking engineering support, DFM feedback before you commit to a batch.

Chat on WhatsApp · +86 186 0755 8161
EN中文