Skip to content

Passivation Service for Stainless Steel Parts

Passivation is one of the core processes we run in-house. Achievable tolerance is Per ASTM A967 / A380, the smallest practical feature is n/a, and typical lead time is 2-4 days from drawing release. We take on both one-off prototypes and repeat production batches.

Because Passivation sits alongside milling, turning, EDM, grinding and finishing under the same roof, parts that need more than one operation do not get shipped between vendors. That removes a tolerance stack-up and, in practice, a week of lead time.

Passivation at a glance

Parameter Capability
Achievable tolerance Per ASTM A967 / A380
Minimum feature n/a
Typical lead time 2-4 days
Prototype quantity 1 piece
Production quantity Up to 50,000 pieces per year
Inspection Dimensional report, CMM on request

What we make with Passivation

  • Stainless after machining
  • Medical instruments
  • Food equipment
  • Post-weld cleanup

Limits and watch-outs

  • Does not remove embedded iron — only free iron
  • Free-machining grades like 303 respond poorly

These are the things that decide whether a part is straightforward or expensive. If any of them applies to your design, put it in the RFQ and we will price the actual process rather than discovering it after the first article.

How to specify Passivation on your drawing

  • State the tolerance on the features that matter, not on the title block
  • State the surface finish and the surfaces it applies to
  • State the material standard, for example ASTM or EN, not just the trade name
  • State the quantity and whether it is a one-off or a repeat programme
  • Attach a STEP file plus a dimensioned PDF drawing

Frequently asked questions

What tolerance can you achieve with Passivation?

Per ASTM A967 / A380, with the smallest practical feature at n/a. Tighter tolerance on individual features is possible with a secondary operation such as grinding, honing or lapping.

How long does Passivation take?

2-4 days is normal. First-time parts need programming, which is included in that estimate. Add 3 to 5 days if a surface finish or heat treatment is involved.

Do you do Passivation in-house or subcontract it?

In-house. We machine, finish and inspect in our own facility, which is why we can commit to a date and to a tolerance without relying on a third party.

What is the minimum order for Passivation?

One piece. There is no formal minimum, but the setup cost dominates below about 20 pieces, so unit price drops sharply once the batch is large enough to amortise programming and fixturing.

Related pages

Get a price for your part

Send a STEP file and a drawing with tolerances, material and quantity. We quote within one working day and machine in our own facility in Shenzhen — milling, turning, EDM, grinding and finishing under one roof, no trading middleman.

Start an instant quote or send your drawings directly. English-speaking engineering support, DFM feedback before you commit to a batch.

Chat on WhatsApp · +86 186 0755 8161
EN中文